As summer approaches, pool owners start preparing for the swimming season.
We've put together a checklist of what to check on your salt chlorinator:
Step one is to test the salinity of the water.
This is done using a manual test kit or a dedicated measuring device. Based on the reading, add salt as needed.
For effective disinfection of your pool water with the chlorinator, it’s important that the salt level in the water stays within the recommended range: 3000-4500 ppm.
Step two, and very important: make sure the electrolysis cell is ready for use, meaning free of scale buildup.
If the cell needs cleaning, follow these steps, as shown in our instructional videos:
Cleaning the Resilience E Cell
Cleaning the Resilience D Cell
Or in the installation guides:
Resilience E installation guide >> (page 15) | Resilience D installation guide >> (page 30)
The following steps apply only to owners of Resilience D Plus systems
Step three: Check whether it’s time to replace the acid dosing pump’s internal tubing (replace every 6 months) – watch the tubing replacement video
While you’re at it, it’s a good idea to check the condition of the roller and the check valve (both should be replaced after a year of use). If they look rusted or worn, replace them as well.
SEKO Acid Pump
A maintenance kit for this is available from our distributors >>
Step four: Check the pH sensor. Measure the water values with a manual or digital test kit and compare them to the reading shown on the device. If there’s a significant deviation (0.3 from the value), calibrate the sensor following these steps shown in the calibration video below:
*Calibration solutions (pH 4 & pH 7) are available at any pool supply store.